SEKAY BİYOGAZ TESİSİ LAGOON COVERING WORKS
In the Biogas Facility operated within the borders of SEKAY Integrated Waste Facility; PVC Tarpaulin top covering construction work was carried out for the lagoon where liquid fermented waste is stored. (Capacity: 40,460 m3)
- PROJE YERİ SAKARYA
- PROJE YILI 2021
- İŞ VEREN ERA ÇEVRE TEKNOLOJİLERİ A.Ş.