SEKAY BİYOGAZ TESİSİ LAGOON COVERING WORKS

In the Biogas Facility operated within the borders of SEKAY Integrated Waste Facility; PVC Tarpaulin top covering construction work was carried out for the lagoon where liquid fermented waste is stored. (Capacity: 40,460 m3)

  • PROJE YERİ SAKARYA
  • PROJE YILI 2021
  • İŞ VEREN ERA ÇEVRE TEKNOLOJİLERİ A.Ş.