The design and installation of the septic tank / system for the 14 Hydroelectric Power Plants and 1 Wind Power Plant operated by Boydak Energy in Artvin, Ordu, Amasya, Van, Kastamonu, Bartin, Tokat, Giresun, Tunceli, Bayburt provinces were designed and installed by us.
Province : Artvin, Ordu, Amasya, Van, Kastamonu, Bartın, Tokat, Giresun, Tunceli, Bayburt, İstanbul
Year : 2017