EKMEK UNLU
Waste Water Treatment Plant and channel connections and infrastructure works were completed for the purpose of treatment of domestic and industrial wastewaters in Gebze Hamburger Bread Facility, which was established to supply hamburger bread to Burger King stores of Ata Holding Group.
Province : Gebze / KOCAELİ
Year : 2016
ALMER GROUP BUILDING
Almer Group Office building has been constructed on 1200 m2 area in Reinforced Concrete and 4 floors in Bağlıca district of Ankara Province.
Province : Etimesgut / ANKARA
Year : 2018
BOYDAK ENERGY FOSSEPTIC LINE
The design and installation of the septic tank / system for the 14 Hydroelectric Power Plants and 1 Wind Power Plant operated by Boydak Energy in Artvin, Ordu, Amasya, Van, Kastamonu, Bartin, Tokat, Giresun, Tunceli, Bayburt provinces were designed and installed by us.
Province : Artvin, Ordu, Amasya, Van, Kastamonu, Bartın, Tokat, Giresun, Tunceli, Bayburt, İstanbul
Year : 2017
AFYON ENERGY BIOGAS PLANT LAGUN
For Biogas Plant which is operated by AFYON ENERGY on the Sülümenli Road of Afyon Province, Its Construction works of Sealed Lagoon with a capacity of 10.500 m3 were made by us.
Province : AFYONKARAHİSAR
Year : 2017
KARAMAN BIOGAS PLANT LAGUN
Construction of Closed Sealed Lagoon has been carried out by us in total 25,900 m3 Wet Volume capacity For the Karaman Biogas Plant operating within the borders of the Barutkavuran village of Karaman province.
Province : KARAMAN
Year : 2017
BOYDAK WASTE FIELDS
14 Hydroelectric Power Plants operated by Boydak Energy in Artvin, Ordu, Amasya, Van, Kastamonu, Bartin, Tokat, Giresun, Tunceli, Bayburt , 1 the Wind Power Plant, Temporary Waste Storage Area construction works have been carried out by us ,in accordance with the legislation, in order to store the wastes from the power plants. Within the scope of this work, design, production, installation and installation services were made by us.
Province : Artvin, Ordu, Amasya, Van, Kastamonu, Bartın, Tokat, Giresun, Tunceli, Bayburt, İstanbul
Year : 2017
AFYON ENERGY ON-SITE ROAD AND DRAINAGE LINE
The Works of Construction of on-site reinforced concrete roads and drainage lines within the scope of field arrangements of The Biogas Plant, which is being operated by AFYON ENERGY on Sülümenli Road in Afyon Province.
Province : AFYONKARAHİSAR
Year : 2018
SÜTAŞ/ENFAŞ BIOGAS LAGUN
Construction of Closed Leakproof Lagoon total area of 8.550 m2 has been carried out by us for Karacabey Biogas Plant which is operated by ENFAŞ Inc.from SÜTAŞ Group Companies.
Province : Karacabey / BURSA
Year : 2016
EKUR MEAT SEWERAGE DISCHARGE AND WATER PIPELINE
In order to supply meatballs to the Burger King stores of Ata Holding Group, the works of 6.150 m sewer line and 2 groundwater wells and 3.250 m transmission line construction work (Well, Pump and Other Material Supply and Application Works) in Amasya Province.
Province : Suluova / AMASYA
Year : 2015